Content: 30419161223770.doc (1.69 MB)
Uploaded: 19.04.2013

Positive responses: 0
Negative responses: 0

Sold: 2
Refunds: 0

$12
Thesis: Operation of the Gas Lift for Kharampur

Contents


1. Brief description of geological-field field

1.1. Lithologic and stratigraphic characteristics of the section

1.2. Tectonics

1.3. Physico-chemical characteristics of the oil, gas, condensate and water

1.4. The reserves of oil, gas and condensate

2. Brief description of the state of development of the field

2.1. Development History

2.2. The current state of development

2.3. Construction of wells

2.4. A method of operating wells, wellhead and downhole equipment

2.5. The system of collection, treatment and transportation of oil and gas

3. Improving the equipment and technology of extraction of natural hydrocarbons

3.1. General principles for gas-lift operation

3.2. Construction of gas-lift lifts

3.3. Start gas lift wells in operation (starting pressure)

3.4. Gaslift valve

3.5. Method of calculation mode gas lift

3.6 The equipment gas-lift wells

3.7. Gas supply systems and gas distribution

3.8 Study of gas lift wells

3.9 Calculation of working gas lift method AP Krylova and GS Lutoshkina

3.10 Calculation of the necessary gas flow, ensuring the rise of the liquid from the bottom of the hole

3.11 hydraulic and thermal design of loops.

3.12 Calculation of changes in pressure and temperature in the summer when the soil temperature Trp = 4 ° C = 277 K.



No feedback yet